Return to the Landscape Design Forum | Post a Follow-Up

 o
Payment terms

Posted by dc_pilgrim (My Page) on
Fri, Apr 2, 10 at 9:33

How do people structure their payment terms on larger jobs?

I assume its some combination of an upfront payment, progress payments with completion, and something on the back end. Would you progress payment based on completing some of the big elements? What is a fair amount to hold to the end?

We are gearing up for the big project ($50K+ range) which will include a retaining wall, fill, a patio, stairs, a flagstone path, and a ton of new plantings (like 1500 sq ft), likely some landscape lighting.

Here is the plan which I have posted before in a thread on finding contractors, if anyone is interested.

Photobucket


Follow-Up Postings:

 o
RE: Payment terms

What did they suggest?


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Landscape Design Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here